With the uppers in for the most part next on the list was to fit in the lower cabinets. Luckily the floors were pretty level. They were a bit out from the front to the back but that was to be expected. Hopeful everything measures out well and they all fit :)
|
Gavin making sure I measure correctly |
I made sure that when the under sink cabinet was being placed that I took special care in measuring out the cut outs for the water supplies/ Drain and power for the Disposal.
With a bit of patience and a lot measuring and leveling the base cabinets are in.
The Refrigerator even fits :)
Once the gas guy finally shows up and runs the gas line to the range we will be able to complete the island as well.
No comments:
Post a Comment